HOTBella Tierra Phase 4-2, Lots 54-200 - Transmitted to Construction
Permit #TW-DEVCON-0626-0045 · tucson · issued Jul 6, 2026
$0
Inspections
Bella Tierra Phase 4-2, Lots 54-200 - Transmitted to Construction
0RICK Engineering (Unverified)
Maricopa County · APN 13630141A
Tucson, AZ, 85730
Bella Tierra Phase 4-2, Lots 54-200 - Transmitted to Construction
Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trialBella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778 )
Showing the last 90 days — Pro shows the full history. See pricing