PERMIT IS ONLY FOR THE INSTALLATION OF TWO SIGEN BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. EFFECTIVE JANUARY 8, 2026, THE CITY OF MESA ADOPTED 2024 ICC AND 2023 NEC. AN APPROVED CODE MODIFICATION WAS ADDED TO THIS PERMIT ALLOWING CONTINUED COMPLIANCE WITH 2018 ICC AND 2017 NEC. STARTING APRIL 8, 2026, ALL NEW PERMITTED PROJECTS NOT SPECIFICALLY CONNECTED TO THIS PERMIT SHALL COMPLY WITH ADOPTED 2024 ICC AND 2023 NEC CODES. PLEASE VISIT MESA DEVELOPMENT SERVICES WEBSITE FOR INFORMATION ON THE ADOPTION PROCESS.
818 S HOBSON
Property record
- Property type:
- RESIDENTIAL
- Year built:
- 1960
- Living area:
- 1,140 sqft
- Total sqft:
- 8,019
- Subdivision:
- MILLETTS GREEN ACRES
- Assessed value:
- $29,770
- Full cash value:
- $297,700
Owner of record
ERIC E IWANSKI LIVING TRUST
818 S HOBSON, MESA AZ 85204
APN 13930020C · Maricopa County Assessor
Water supply
- Management area:
- Phoenix AMA
- Water provider:
- City Of Mesa
Arizona Department of Water Resources
Permits (1, last 90 days)
WARMPermit Is Only For The Installation Of Two Sigen Batteries. All Work To Be Performed Per 2018 Irc, Manufacture’S Installation Instructions And Service Utility Provider Specifications. Permit Does Not Include Photovoltaic System Installation. Do Not Disconnect Utility Wires Or Meters. Schedule Disconnect/Reconnect With The Serving Utility And Obtain Utility Service Requirements Specific To Your Scope Of Work. Failure To Schedule Disconnect May Result In Additional Utility Trip Charge Fees And Charges For Any Damage To Distribution Equipment.
Effective January 8, 2026, The City Of Mesa Adopted 2024 Icc And 2023 Nec. An Approved Code Modification Was Added To This Permit Allowing Continued Compliance With 2018 Icc And 2017 Nec. Starting April 8, 2026, All New Permitted Projects Not Specifically Connected To This Permit Shall Comply With Adopted 2024 Icc And 2023 Nec Codes. Please Visit Mesa Development Services Website For Information On The Adoption Process.
Permit #PMT26-05632 · mesa · issued Apr 27, 2026
$25,622
C of C Issued
0Arizona Solar Wave & Energy LLC (Verified)
Showing the last 90 days — Pro shows the full history.
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trial