New sewer service is proposed for 601 S. 92nd St., APN 22070204, located in Maricopa County jurisdiction.
0601 S 92ND ST
Permit applied — not yet issued
Filed 36d ago · well past the typical ~16d window — likely revising or phased
Based on mesa's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
Permits (5, last 90 days)
Cell located in a ROW in the City of Mesa. The adjacent parcel is 219-26-444. The small cell is located at coordinates 33.458569, -111.650113. Remove existing 35'-6" tall light pole: install new 36'-0" tall light pole w/foundation: install [1] new antenna on new light pole: install [2] new radios in new equipment shroud: install [3] new antennas w/ integrated radio: install [1] new equipment cabinet on new concrete pad: install [1] new meter pedestal on new concrete pad. Special inspection req. steel, concrete, drilled pier, anchor bolts. Elec Meter: (1) 1ph. Results in CofC.
Potholing plan for underground utility excavation
0Construction, repair, remodeling, demolition, and excavation work activities may be conducted between 6:00 a.m. through 8:00 p.m. Monday through Friday. Construction work outside of the permitted timeframes will require an afterhours permit. Afterhours permits for construction are subject to the following conditions and Building Official approval: 1. The applicant must provide the following information: a. Location of work – 8026 E. University Dr b. Schedule of hours and days – Concrete scheduled for 4am on Tuesday April 14th c. Scope of work to be performed- pouring concrete slab d. Anticipated noise generated from the work performed – Noise from concrete trucks backing up and concrete pump. e. Construction permit number (ex. PMT, UTL, ROW) PMT25-21329 2. Applicant shall notify all residence within 500 feet of the project property line in writing. f. The notice shall explain the purpose of the afterhours work and the times and days the work will be performed. Letters have been delivered to all houses within 500 ft. g. The notice shall provide the name and phone number of the after-hours work supervisor.- Eric Lomeli was named in the letter 3. All reasonable efforts will be taken to mitigate noise. - Yes 4. All reasonable efforts will be taken to mitigate fugitive light. - Yes 5. The applicant will respond positively to neighbor complaints. - Yes 6. The Development Services Department can cancel this permit if legitimate complaints are not resolved. Agreed
0Improvements along warner ave from Meridian Rd to the Powerline Floodway