HOTPermit Is Only For The Installation Of Two Sigen Batteries And One Pointguard Battery Pack. All Work To Be Performed Per 2024 Irc, Manufacture’S Installation Instructions And Service Utility Provider Specifications. Permit Does Not Include Photovoltaic System Installation. Do Not Disconnect Utility Wires Or Meters. Schedule Disconnect/Reconnect With The Serving Utility And Obtain Utility Service Requirements Specific To Your Scope Of Work. Failure To Schedule Disconnect May Result In Additional Utility Trip Charge Fees And Charges For Any Damage To Distribution Equipment.
Permit #PMT26-10272 · mesa · issued Jun 16, 2026
$47,336
Issued
PERMIT IS ONLY FOR THE INSTALLATION OF TWO SIGEN BATTERIES AND ONE POINTGUARD BATTERY PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT.
0