WARMWe made all doorways wheelchair accessible. We replaced the aging roof. We replaced the old galvanized plumbing with copper plumbing. We replaced the old clay pipe sewer line which had a large leak with new heavy-duty plastic sewer pipe.
We placed a new heat pump on the roof with new insulated duct work. We put in new porcelain floors in every room.
We added new appliances and cabinets. We replaced all windows with double-paned windows.
Permit #TC-RES-0825-04136 · tucson · issued Jun 4, 2026
$15,000
Inspections
We made all doorways wheelchair accessible. We replaced the aging roof. We replaced the old galvanized plumbing with copper plumbing. We replaced the old clay pipe sewer line which had a large leak with new heavy-duty plastic sewer pipe. We placed a new heat pump on the roof with new insulated duct work. We put in new porcelain floors in every room. We added new appliances and cabinets. We replaced all windows with double-paned windows.
973 sq ftG & D Design LLC (Likely)