HOTConverting tub to shower, replacing pan, drain, and valves.
Converting shower to shower, replacing pan, drain, and valves.
Permit #2601777 · peoria · issued Jun 15, 2026
$219,302
Permit Issued
Converting tub to shower, replacing pan, drain, and valves. Converting shower to shower, replacing pan, drain, and valves.
Jacuzzi Bath and Remodel (Unverified)