HOTInstallation Of 50-Ft Of 1.5-In Pe Gas Line Buried 18-In With 14 Gauge Tracer Wire From Gas Meter To 400k Btu Pool Heater. All Gas Lines To Be Installed Per 2024 Ifgc & Sw Gas Requirements. Sw Gas To Determine If The Meter Needs To Be Upgraded.
Permit #PMT26-12718 · mesa · issued Jul 28, 2026
$1,250
Issued
INSTALLATION OF 50-FT OF 1.5-IN PE GAS LINE BURIED 18-IN WITH 14 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
0