HOTThis project is intended to replace the existing hydronic 4-pipe chilled water & heating water air handing units with DX refrigerant based units, including some associated electrical and structural scope. The replacement of existing AHU pneumatic controls to Direct Digital Controls (DDC) shall be implemented on this project.
Permit #TC-COM-0526-00702 · tucson · issued Jun 16, 2026
$907,000
Issued
This project is intended to replace the existing hydronic 4-pipe chilled water & heating water air handing units with DX refrigerant based units, including some associated electrical and structural scope. The replacement of existing AHU pneumatic controls to Direct Digital Controls (DDC) shall be implemented on this project.
0Kappcon (Unverified)