TP-PRE-1125-00238, TD-DEV-0126-00008 Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT *TC-COM-0526-00737*: “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. SEE SEPARATE PERMIT *TC-COM-0526-00763*: Permit #2 “Phase 1” foundation/slab design to expedite review of concrete work. 3. (******THIS PERMIT******): Permit #3 "Phase 2" above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines.
Maricopa County · APN 14122004L
8755 S RITA RD UNIT BLDG 2 TUCSON AZ 85747
Tucson, AZ, 85747
Property record
- Assessed value:
- $5,039,191
- Full cash value:
- $70,832,486
Neighborhood
- Owner-occupied:
- 81% of homes
- Median home value:
- $345,900
- Median household income:
- $107,290
- Median year built:
- 2002
Permits (4, last 90 days)
Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. (******THIS PERMIT******): “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. SEE SEPARATE PERMIT: Permit #2 broken into “Phase 1” foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines.
Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT: “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. THIS PERMIT: Permit #2 broken into Phase 1” (******THIS PERMIT******) foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 (SEE SEPARATE PERMIT) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines.
Showing the last 90 days — Pro shows the full history. See pricing
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trial