HOTOtce - Replace 200a Panel With New 225a Panel With 200a Main Breaker.
Permit #2602915 · peoria · issued Sep 1, 2026
Permit Issued
OTCE - REPLACE 200A PANEL WITH NEW 225A PANEL WITH 200A MAIN BREAKER. 40A BREAKER FOR SOLAR TO BE LOCATED ON OPPOSITE END OF BUS BAR. DEADFRONT TO BE ON-SITE FOR INSPECTIONS.
Cool Blew Inc (Likely)