HOTVerizon Proposes To Modify An Existing Wireless Installation.
Permit #COMM-2026-00375 · gilbert · applied Oct 22, 2026
~$26,934est
Under Review
VERIZON PROPOSES TO MODIFY AN EXISTING WIRELESS INSTALLATION. THE SCOPE WILL CONSIST OF THE FOLLOWING:PMI - EVERY SITE REQUIRES A PMI SUBMISSION TO THE EOR FOR THE FINAL ANTENNA PLACEMENTTOWER SCOPE: 1. INSTALL (4) NEW ANTENNAS, (1) PER SECTOR 2. INSTALL (1) 30M HYBRID CABLE 3. RETAIN EXISTING ANTENNAS, RRH'S, OVP, AND HYPER-FLEX GROUNDWORK SCOPE: 1. NO WORK
0Smartlink LLC (Likely)