1) Replacing approx. 30 feet of 3" ABS sewer line from the main house sewer line to just before the…
Permit #TC-RES-0826-04860 · tucson · issued —
~$5,766est
Withdrawn
1) Replacing approx. 30 feet of 3" ABS sewer line from the main house sewer line to just before the sidewalk Installing a new 3" ABS, 150 feet of sewer line from the guest house to just before the sidewalk and tying them together. (approx 180 feet total) 2) We will also be performing the complete rough in of the bathroom and kitchen of the guest house 3) Install of brand new Rheem 18kW 3.51 GPM 240-volt Self-Modulating Electric Tankless Water heater in guest home (specs attached separately)
0Al Coronado Plumbing LLC (Likely)