Installation of a 60A Tesla EV Charger
Permit #2601839 · peoria · issued —
$376,474
Admin Process
Installation of a 60A Tesla EV Charger
Inty Power LLC (Likely)
Filed 82d ago · well past the typical ~23d window — likely revising or phased
Based on peoria's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
APN 20109666 · Maricopa County Assessor
Arizona Department of Water Resources
Maricopa County sales affidavits · sale dates resolve to month
ZIP 85383 · U.S. Census ACS 2023 5-year
Installation of a 60A Tesla EV Charger
MPU TO 200A SES W/100A PARALLEL ENERGY SLOT. THE 200A MCB SHALL BE DE-RATED TO 175A FOR EXST PV SYSTEM (SIEMENS MC4040S1200SC)
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trialSolar - Install 11.50 KW (AC) PV System with 13.50KW battery integrated + MPU(APS)
Showing the last 90 days — Pro shows the full history. See pricing