Interior modification to existing baler/process area. Construct new 8-inch CMU wall and associated concrete curb to provide a 1-hour fire-resistance-rated separation between the existing F-1 Baler Room and H-3 Extruder/Open Process Area. Work includes demolition of existing door/wall components, modifications to existing openings, relocation of affected equipment/controls, and associated structural work. Existing building is Type II-B construction and fully sprinklered. Special inspections required for masonry construction and post-installed anchors. Reviewed as noted. Results in CofC.
Maricopa County · APN 30434036C
6533 S MOUNTAIN RD
Mesa, AZ, 85212 · Commercial
Permit applied — not yet issued
Filed 17d ago · in the typical ~16d issue window now — quote before it pulls
Based on mesa's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
Property record
- Property type:
- COMMERCIAL
- Year built:
- 2013
- Total sqft:
- 428,992
- Assessed value:
- $942,277
- Full cash value:
- $6,281,853
Water supply
- Management area:
- Phoenix AMA
- Water provider:
- City Of Mesa
Sales history
- Dec 1, 2012$1,372,140WD
Neighborhood
- Owner-occupied:
- 85% of homes
- Median home value:
- $530,700
- Median household income:
- $123,404
- Median year built:
- 2010
Permits (3, last 90 days)
This record ID is to track the letter agreement to establish in lieu payments from Bridgestone from December 3, 2012 development agreement that weren't paid BATO and the City agree that BATO will make an in-lieu payment to the City in the amount of $1,174,366.00 ("In-Lieu Payment") As a modification to the requirement in Section l .5(c) of the Development Agreement that requires payment within ninety (90) days of the City Engineer's approval of the cost estimate, the City agrees to allow BATO to pay the In-Lieu Payment in five (5) equal installments, each in the amount of $234,873.20. Each installment payment is due on or before the following dates: (i) within thirty days. Record related to DA26-02404
0Remove and replace AFFF foam with new NFF foam. Includes new tank, valves and associate piping. Existing sprinkler heads and associated piping to remain. New hydraulic calculations for updated density requirement for new foam provided. Approved with Stipulations: Per design, a 700-gallon CHEMGUARD bladder tank is required to meet the 633 concentrate gallons needed. 2024 IFC as adopted is the applicable code. City Code, Title 7, Chapter 2
Showing the last 90 days — Pro shows the full history. See pricing
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trial