Submitting to obtain a ROW permit. Existing 1.5" domestic water meter was removed during building demolition. A new 1.5" domestic meter will be required with the new building plans when that permit is submitted. The purpose of this permit submission is to obtain a ROW permit to complete a hot tap onto an existing COM waterline within an existing PUE for purposes of providing fire water to the new building as well as to install a new 1.5” domestic water meter.