HOTRemove existing 125 a load center and replace with new 125a load center with surge protection.
Permit #TC-COM-0826-01392 · tucson · issued Aug 27, 2026
$5,760
Inspections
Remove existing 125 a load center and replace with new 125a load center with surge protection. No meter socket replacement, no increase and no relocation for commercial side
0Environmental Conditioning LLC (Likely)