EXTERIOR STORAGE UNIT 7'X7' TO BE PLACE ON A CONCRETE SLAB EXISTING GRADE. STORAGE USE OF ALUMINUM-MAGNESIUM ALLOY. ADDITIONAL INFORMATION IS PROVIDED IN A TECHNICAL MEMORANDUM BY GHD INCLUDED WITH SUBMITTAL. LOCATION OF SLAB AND 7'X'7 ALREADY HAS BEEN APPROVED BY THE AIRPORT FACILITIES.
Maricopa County · APN 30437004E
5559 S SOSSAMAN RD 103
Mesa, AZ, 85212 · Commercial
Permit applied — not yet issued
Filed 2d ago · typically issues ~16d after filing (≈14d out)
Based on mesa's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
Property record
- Property type:
- COMMERCIAL
- Year built:
- 2020
- Total sqft:
- 8,956,758
- Assessed value:
- $16,516,799
- Full cash value:
- $110,111,998
Water supply
- Management area:
- Phoenix AMA
- Water provider:
- City Of Mesa
Neighborhood
- Owner-occupied:
- 85% of homes
- Median home value:
- $530,700
- Median household income:
- $123,404
- Median year built:
- 2010
Permits (5, last 90 days)
Installation of (2) equipment platforms approx. 700 SF and 760 SF in an F-1 occupancy area within an existing 130,376 SF, type II-B construction, group B, F1 and S1 building. Special inspection req. Epoxy/Expansion anchors, concrete, steel, welding. Deferred fire sprinklers. REF: PMT26-06512 for Building TI associated permit. Results in CoC.
Construction of a new 300 SF accessory Group H-3 control room within an existing Type II-B aircraft hangar. Scope includes new 2-hour fire-resistance-rated walls and ceiling, exhaust ventilation, and associated control-room improvements. Code modification for control-room location under PMT26-13785. Separate hangar work under PMT26-06512. Outdoor hazardous material storage will be permitted separately. Special inspection for electrical. Deferred chemical fire protection system and fire alarm system with hydrogen detection. Reviewed as noted. Results in CoO.
Tenant improvement in existing type II-B construction, mix group S-1, B, H-3, S-2 and F-1 occupancy hanger facility at Mesa Gateway Airport. Modification include converting 331 SF of group F-1 space into B occupancy conference room, new partitions and doors to create conf room with new ceiling, millwork, lighting and power, new ductwork from existing units. Improvements continue in existing training breakroom area to provide new countertop with sink and appliances with associated elec and plumb work. Scope includes Install of (3) EV charging stations at existing parking and adding lighting to existing flag pole, new 225A panel and elec meter. Less than 15 fire sprinklers will be added/relocated. Deferred fire alarm. Approved with comments. Results in CoC.