Replace beverage equipment and associated MEP with new. Demo identified equipment, drains, water lines, refrigeration lines, and floor sinks. Remove power back to electrical panel for demolished equipment. Install new equipment, waste lines floor sinks, water lines, beverage lines, power for new equipment. Replace existing RTU glycol chiller condensing unit with new. Results in CoC