HOTReplace meter socket, and both load centers that are double tapped.
Permit #TC-RES-0926-04977 · tucson · issued Sep 10, 2026
~$6,000est
Issued
Replace meter socket, and both load centers that are double tapped. Replacing with New 200Amp “All-in-One” (Eaton or SqD) with main breaker. No change of location for mast.
0Environmental Conditioning LLC (Likely)