HOTConverting Existing Workshop And Part Of Existing Rv Garage Into Habitable Space With 2nd Story On The Rv…
Permit #BLDR2602756 · maricopa-county · issued Sep 22, 2026
$100,000
Issued
CONVERTING EXISTING WORKSHOP AND PART OF EXISTING RV GARAGE INTO HABITABLE SPACE WITH 2ND STORY ON THE RV GARAGE PART (UPSTAIRS: BEDROOM WITH WIC / DOWNSTAIRS: LIVING ROOM BATHROOM AND KITCHEN). 160 LF OF 5FT TALL CMU FENCE WITH 2 GATES.
1,004 sq ftBaker Design Group Inc (Likely)