Minor tenant improvement within an existing 92,533 SF, construction type III-B warehouse, including the construction of (1) new accessible restroom, installation of two dock pit levelers, structural, related mechanical, plumbing, and electrical. Existing B and S-1 occupancies to remain unchanged. Special inspection for concrete and post installed anchoring. Less than 15 fire sprinkler heads will be added/modified. Reviewed as noted. Results in CoC.
Maricopa County · APN 31328796
3825 S EVERTON TERR 126
Mesa, AZ, 85212 · Commercial
Permit applied — not yet issued
Filed 35d ago · well past the typical ~16d window — likely revising or phased
Based on mesa's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
Property record
- Property type:
- COMMERCIAL
- Year built:
- 2023
- Total sqft:
- 2,638,352
- Subdivision:
- EASTMARK DEVELOPMENT UNITS 5 AND 6
- Assessed value:
- $16,036,127
- Full cash value:
- $106,907,518
Water supply
- Management area:
- Phoenix AMA
- Water provider:
- City Of Mesa
Neighborhood
- Owner-occupied:
- 85% of homes
- Median home value:
- $530,700
- Median household income:
- $123,404
- Median year built:
- 2010
Permits (4, last 90 days)
Scope of work includes the tool install for the phase 3 Nomaflex line. Scope includes the installation of a pump and electrical distribution to power the phase 3 Line. The scope also includes safety and regulatory compliance requirements to deliver an operational manufacturing facility and establish the infrastructure needed for future expansion
0Not work under this permit. Limited temporary storage only. No high pile and no hazardous materials storage. This approval is temporary and does not replace any permits or approvals required for the future build-out or occupancy of the building.
Scope of work consists of constructing and installing the facility infrastructure required to support manufacturing operations at the mesa plant. The work includes installation of compressed air, chilled water, isobutane gas, ventilation, electrical power distribution, and vacuum systems, as well as the relocation and installation of one Nomaflex extrusion line. The scope also includes safety and regulatory compliance requirements to deliver an operational manufacturing facility and establish the infrastructure needed for future expansion. Deferred fire sprinklers and fire alarm.