Installing a temporary gas powered generator, 600A main feed breaker, for power to a new building. Builder and owner want to get final inspections and CofO for the building while powered by a generator until SRP completes its work. Results in CofC.
Filed 43d ago · well past the typical ~16d window — likely revising or phased
Based on mesa's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
Installing a temporary gas powered generator, 600A main feed breaker, for power to a new building. Builder and owner want to get final inspections and CofO for the building while powered by a generator until SRP completes its work. Results in CofC.
Tenant improvement of an existing commercial restaurant suite (PAD 2A at 3519 S Ellsworth Rd). Base building permit PMT23-11381
Install new flagpole and associated lighting. New structural and electrical. Results in CoC.
New 3,938 SF construction type V-B shell retail building with 1,088 SF of overhangs (north of the drive overhang-canopy). Special inspection for fabricators, steel, concrete, masonry, post-installed anchoring, and fire-rated assemblies. Civil, electric meters and water meters under PMT23-08741. Fire Sprinklers under PMT23-08741F. Addendum under PMT23-08741D for building changes. Related to PMT23-08741. Fire alarm plans will be submitted under PMT23-08741. Results in CoC.