HOTGas_49ft Of 3in Pe From Meter To Heater (400k) Then 90ft Of 1 1/4in Pe From Heater To Tees. Then 22ft Of 1in Pe From Tees To Two Fire Pits (75k Each). Then 17ft Of 1in Pe From Tee To Bbq (65k).
Permit #2601750 · peoria · issued Jun 18, 2026
$35,473
Permit Issued
GAS_49FT OF 3IN PE FROM METER TO HEATER (400K) THEN 90FT OF 1 1/4IN PE FROM HEATER TO TEES. THEN 22FT OF 1IN PE FROM TEES TO TWO FIRE PITS (75K EACH). THEN 17FT OF 1IN PE FROM TEE TO BBQ (65K).
Kerns Plumbing LLC (Likely)