HOTNew 225a Panel With 200a Main Breaker. Solar To Be Installed At Opposite End.
Permit #2602463 · peoria · issued Sep 14, 2026
Permit Issued
NEW 225A PANEL WITH 200A MAIN BREAKER. SOLAR TO BE INSTALLED AT OPPOSITE END. DEADFRONT TO BE ON-SITE FOR INSPECTIONS
Capital Energy LLC (Likely)