HOTFarallon Unit 3 - Right Of Way - Install A Permanent Bleed Off Pipe Ofr Overflow Of Water To Drain Into Basin…
Permit #ENGROW-26-0285 · buckeye · issued Aug 31, 2026
Issued
FARALLON UNIT 3 - RIGHT OF WAY - INSTALL A PERMANENT BLEED OFF PIPE OFR OVERFLOW OF WATER TO DRAIN INTO BASIN ON E SIDE OF 262ND LANE PER MAG STDS - ***CONTACT CIVIL INSPECTOR ISAIAH CHAVIRA AT 623-640-4495 BEFORE COMMENCING WORK***
0DRH Construction Inc (Unverified)