I will install a new 100 amp overhead service panel on the back of the unit where the main 30 amp wire now feeds into the interior sub panel. I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant.
Maricopa County · APN 111073520
2531 N EDITH BL TUCSON AZ 85716
Tucson, AZ, 85716
Property record
- Assessed value:
- $31,034
- Full cash value:
- $365,000
Neighborhood
- Owner-occupied:
- 38% of homes
- Median home value:
- $300,900
- Median household income:
- $47,009
- Median year built:
- 1964
Permits (5, last 90 days)
I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant.
I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant. Once power has been restored I will make sure that everything is working as it did before.
I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant. Once power has been restored I will make sure that everything is working as it did before.
I will install a 100 amp all in one panel with a main 100 amp breaker and 16 to 24 spaces. I will install a new riser, weather head, point of attachment, brace kit with 2 5ft braces bolted to the roof and 1/0 aluminum feeder wire to supply up to 125 amps. I will then install 2 new 8ft 5/8 copper clad ground rods interconnected with 4 gauge copper ground wire and tied to the new panel. I'll also install new water and gas bonding interconnected together and tied to the the panel with #6 copper ground wire. I will install a 30 amp breaker to feed the interior panel and install any other breakers that are necessary for the apartment. I'll label the panel with a label maker and install a metal address label on the outside of the panel. I will seal any penetrations in the roof with a roofing jack and roofing sealant.