TENANT IMPROVEMENT FOR: BUCKEYE 77 - CRANE AWS TO EXISTING SHELL WAREHOUSE BUILDING ADDING (3) NEW OFFICE SPACES, NON-LOAD BEARING WALLS, FINISHES, AND MILLWORK AND ALL ASSOCIATED ELECTRICAL, MECHANICAL & PLUMBING. THE WAREHOUSE AREA WILL INCLUDE A SCRUBBER DUMP, EYE WASH STATIONS, AND ELECTRICAL ONLY FOR FORKLIFT AND BATTERY CHARGING STATION(S). THE SITE WORK WILL INCLUDE AN 8' HIGH CMU WALL TO MATCH EXISTING CMU ADJACENT TO W. SOUTHERN AVE, NEW MANUAL ACCESS GATE WITH KNOX BOX FOR EMERGENCY ACCESS, NEW 8' HIGH CHAINLINK FENCE ALONG THE EAST SIDE AND SOUTH SIDE OF THE PROPERTY TO SECURE THE TRUCK YARD AND TRUCK ACCESS / PATH OF TRAVEL. ALSO INCLUDES (1) S.E.S. - C AND (3) BACKUP GENERATORS THAT WILL HAVE A STEEL WALL ENCLOSURE WITH METAL SLATS - PER APPROVED PLANS ** SEPARATE SUBMITTALS: RACKING/HP RACKING, GUARD SHACK, AND INTERIOR/EXTERIOR SIGNAGE PACKAGE ** DEFERRED SUBMITTALS: FIRE SPRINKLER, FIRE ALARM, AND ANCHORAGE DESIGN FOR ALL ELECTRICAL EQUIPMENT REQUIRED **
Maricopa County · APN 50465344
24105 W SOUTHERN AVE BUCKEYE AZ 85326
Buckeye, AZ, 85326 · Commercial
Property record
- Property type:
- COMMERCIAL
- Year built:
- 2022
- Total sqft:
- 2,948,649
- Subdivision:
- BUCKEYE 77
- Assessed value:
- $16,898,958
- Full cash value:
- $112,659,724
Water supply
This parcel falls within an issued Assured/Adequate Water Supply determination — a prerequisite for new-subdivision development in Arizona.
- Management area:
- Phoenix AMA
- Water provider:
- Valencia Water Company
- AAWS provider:
- Valencia Water CO
- Determination issued:
- Jul 6, 2006
Neighborhood
- Owner-occupied:
- 80% of homes
- Median home value:
- $342,400
- Median household income:
- $91,444
- Median year built:
- 2006
Permits (3, last 90 days)
BUCKEYE 77 CRANE/AWS - INSTALL NEW ELECTRICAL INFRASTRUCTURE TO SUPPLY POWER FOR CRANE/AWS PHASED OPERATIONS IDF CABINETS IN THE GL 12-35 AREAS OF THE BUILDING PER APPROVED PLANS
INSTALLATION OF ELECTRICAL INFRASTRUCTURE TO SUPPLY POWER FOR CRANE/AWS PHASED OPERATIONS IN THE GL 1-12 AREAS OF THE BUILDING. THERE ARE (6) IDF CABINETS, (1) SECURITY OPERATIONS CENTER RUN, AND (1) BATTERY CHARGING STATION WITH (7) DISCONNECTS. THE ELECTRICAL ENGINEER HAS PROVIDED CLOUDED PANEL SCHEDULES AND PLANS TO ACCOUNT FOR THESE ADDITIONAL LOADS **FIELD VERIFY**
Showing the last 90 days — Pro shows the full history. See pricing
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trial