HOTUpgrade electrical meter and panel from 100A to 200A single phase meter at an existing building.
Permit #PMT26-07060 · mesa · issued Aug 20, 2026
$4,800
Issued
Upgrade electrical meter and panel from 100A to 200A single phase meter at an existing building. Results in CofC.
0LUCID INNOVATIONS LLC (Verified)