Tenant improvement of existing 28,275 SF type VB construction group E, A3 B and S1 occupancy Boys and Girls Club. Modification of approx. 13,000 SF existing space to include new walls and doors to create various education rooms, admin offices, new reception area, and restroom facilities. Main Gym is separated from remainder of bldg by existing 2hr fire wall. Scope includes building addition of 2,918 SF to provide secure lobby, conference and additional education space. Associated MEP scope: mech new duct distribution from existing / relocated units, plumbing for new restroom facility, elect with new lighting, power, and new distribution with existing service. Results in CoO. Special inspection req. concrete, epoxy anchor. Deferred - Prefabricated Trusses. Deferred fire sprinklers and fire alarm. REF: PMT26-09681 Demo - Interior only. REF: PMT26-05665 - Kitchen demo / TI. REF: PMT25-19384 - Adj Classroom Bldg. Results in CoO.
Maricopa County · APN 13940039
221 W 6TH AVE
Mesa, AZ, 85210 · Commercial
Permit applied — not yet issued
Filed 80d ago · well past the typical ~16d window — likely revising or phased
Based on mesa's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
Property record
- Property type:
- COMMERCIAL
- Year built:
- 1994
- Total sqft:
- 167,706
- Assessed value:
- $737,711
- Full cash value:
- $4,918,078
Water supply
- Management area:
- Phoenix AMA
- Water provider:
- City Of Mesa
Neighborhood
- Owner-occupied:
- 47% of homes
- Median home value:
- $301,600
- Median household income:
- $59,680
- Median year built:
- 1982
Permits (6, last 90 days)
Demo windows and portion of CMU wall in existing building. Infill masonry wall. Remove one existing RTU to be reused on future phase and one existing RTU to remain in place. Install new RTU in place of removed existing RTU. Store removed existing RTU on sleepers next to new RTU. Remove identified return and supply air ducts. Install new supply, return, and exhaust air ducts. New plenum above exhaust grille. New water supply lines for 3-comp sink, prep sink and hand wash sink. New waste line for new floor sinks. New kitchen equipment. Special inspections required: epoxy anchors, masonry construction, and post-installed anchors. Deferred fire sprinklers and fire alarm. Results in CofC.
Demolition interior building elements including partition walls, mechanical ducts, underfloor and above floor plumbing, concrete slab, electrical distribution, ceilings and selective structural demo.
Showing the last 90 days — Pro shows the full history. See pricing
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trial