HOT50a (2) Circuit For Ev Charger // Install Per Manufacturer'S Recommendation And 2017 Nec
Permit #BLDR2606348 · maricopa-county · issued Aug 24, 2026
$2,000
Issued
4,885 sq ft
Maricopa County · APN 50262212
Buckeye, AZ, 85396 · Residential
Filed 24d ago · in the typical ~20d issue window now — quote before it pulls
Based on buckeye's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
This parcel falls within an issued Assured/Adequate Water Supply determination — a prerequisite for new-subdivision development in Arizona.
Installing 2 electrical car chargers off main panel. First will be a direct wire 50 circuit. The second will be a 50 amp car charger outlet for future use.