HOTNew shared use path along the East side of the Eastern Canal from Broadway Rd to Baseline Rd.
Permit #PMT26-16404 · mesa · issued Sep 21, 2026
~$22,873est
Issued
New shared use path along the East side of the Eastern Canal from Broadway Rd to Baseline Rd. New asphalt paved pathway, pedestrian lighting, and crosswalk improvements. New lighting connected to existing electrical power. Results in CofC.
0Sunrise Engineering (Unverified)