Warner Road Improvement
E WARNER RD
Permits (29, last 90 days)
REMOVE & REPLACE 500 GAL U/G PROPANE TANK
0COMPLETE SITE DEMOLITION
0Installation of one illuminated wall sign SUPER RADIATOR COILS 144 sq ft. Signs shall be installed per NEC 2023 with UL listed components.
Keystone Homes Warner & Recker
A/A - SUITE 11 (RANGE 11-14)
TI - SUITE 101
BANNER HEALTH CENTER
TI of an existing 223,442 SF construction type II-B unlimited area warehouse building with spec suite. Scope includes second floor addition of 150,489 SF and buildout of first and second floors. Foundation, underground plumbing, and structural items under PMT25-21825. Also including interior parking garage, gym, skate park, mercantile area, MEP's, exterior generators, exterior diesel storage tank, refrigeration rooms, interior walls, and finishes. New 6-inch water meter, (2) new electric meters. Deferred fire sprinklers, fire alarm with notification devices, high-piled combustible storage racking, access control. Special inspection for electrical. Approved with stipulations. Results in CoO.
A/A --- SUITE 16
0Civil improvements. New water meters, (2) 1.5-inch landscape meters. Results in CoC.
TI
TI in an existing type II-B construction data hall. Scope includes installation of (32) new 400A busways fed from (3) existing PDU's. Results in CoC.
Hopewell Industrial Park
TI--SUITE 102 ( Suite remodel and combine SUITE 102 - 108)
The installation of pre-manufactured high pile storage racks. The installation of pre-manufactured high pile storage racks. Approved with comments - Special inspection req. - Anchoring (Hold Permit Issuance until Special inspection form is submitted). Results in CoC.
0Hawes Crossing Village 5 -Townhome Improvement Plans. (1) 1ph elect meter, (1) 1-inch landscape meter. (72) 1-inch domestic water meters.
Keystone Homes Warner & Recker
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trial