HOTInstall a 100A single phase electrical meter, electrical panel, and receptacle for temporary power at construction site for a new hotel (PMT25-14213). Results in CoC.
Permit #PMT26-06892 · mesa · issued Jun 23, 2026
$18,462
Issued
Install a 100A single phase electrical meter, electrical panel, and receptacle for temporary power at construction site for a new hotel (PMT25-14213). Results in CoC.
0S R Bray LLC (Verified)