Solar- Install 135.66KW solar photovoltaic energy generation system on fuel island canopy(ies), including trenching to back exterior wall of store for feeder conductors to utility line side interconnection (SRP)
Filed 65d ago · well past the typical ~23d window — likely revising or phased
Based on peoria's typical applied→issued time — the earliest a supplier can engage, before the slab is poured.
APN 20063594 · Maricopa County Assessor
Arizona Department of Water Resources
Other Maricopa parcels owned by QUIKTRIP CORPORATION
Owns 131 Maricopa parcels · ~$383,052,224 full-cash value. Likely a builder or institution.
ZIP 85381 · U.S. Census ACS 2023 5-year
Solar- Install 135.66KW solar photovoltaic energy generation system on fuel island canopy(ies), including trenching to back exterior wall of store for feeder conductors to utility line side interconnection (SRP)
Showing the last 90 days — Pro shows the full history. See pricing
Want to see permits older than 90 days? Sign up free.
Sign up — 14-day Pro trial