Replace existing 200A main electrical panel with a new 200A main panel — like-for-like, no service-size…
Permit #RMISC-2026-00611 · gilbert · issued Jul 14, 2026
~$2,500est
Finaled
Replace existing 200A main electrical panel with a new 200A main panel — like-for-like, no service-size change — due to a damaged/failed busbar. Includes new breakers, grounding/bonding, load calculation, and SRP coordination for meter pull and reset. Casther Electric LLC, ROC #311594
0Casther Electric LLC (Likely)