Installation of Gas Line from existing 2" PE Pipe from pool heater. Connection from the gas line to 1" PE Pipe 85' to 50,000 BTU Fire Pit, then an additional 20' 1" PE Pipe to the BBQ 50,000 BTU
Permit #RMISC-2026-00395 · gilbert · issued May 28, 2026
Finaled
Installation of Gas Line from existing 2" PE Pipe from pool heater. Connection from the gas line to 1" PE Pipe 85' to 50,000 BTU Fire Pit, then an additional 20' 1" PE Pipe to the BBQ 50,000 BTU
0Baum Plumbing LLC (Likely)