The inspection of the site identified the following: Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction in compliance with 2023 NEC, 2024 IRC/IBC requirements. Any alterations or changes will require submitting plans before any restoration can begin. During the damage inspection the following was observed: No damage to any structural members Electrical sustained minor damage. Mechanical was not damaged no repairs needed. Plumbing does not appear to be damaged Note: Any structural members charred to a depth of 1/8” or greater are to be replaced. All plumbing, electrical and mechanical systems damaged by heat are to be replaced. A. Building is: Commercial B. Building permits and inspections are required for the following phase (s) of construction: 1. Structural No 2. Electrical Yes 3. Mechanical No 4. Plumbing No 5. Construction Plans Required No Electrical service can be restored under the following conditions: Electric can be restored once we receive a letter from a licensed electrician stating that it is safe to restore power. Must be on official letter head from electrician with their ROC license number, clearly stating that it is safe to restore power, and signed. Natural gas service can only be restored after a gas test has been approved by the building inspector. If you have questions please call 480-644-4273