WARMnew sewer group for bathroom in single bath unit, unit A of duplex. 3x4 90 to a 3" 45, bath and vanity tied in off of separate combos. sewer line goes through hall way and out the side of the house, 2 way cleanouts installed outside of exterior wall. pipe wrapped in foam going through footer. 3" abs ties into pre existing abs outside. bathroom group being venter off of pre existing vent, tied in with mission band to orangeburg pipe.
Permit #TC-RES-0426-01765 · tucson · issued Apr 14, 2026
$1,000
Inspections
new sewer group for bathroom in single bath unit, unit A of duplex. 3x4 90 to a 3" 45, bath and vanity tied in off of separate combos. sewer line goes through hall way and out the side of the house, 2 way cleanouts installed outside of exterior wall. pipe wrapped in foam going through footer. 3" abs ties into pre existing abs outside. bathroom group being venter off of pre existing vent, tied in with mission band to orangeburg pipe.
800 sq ftQuail Plumbing Services, LLC (Likely)