HOT245 N Neely Street: We will be installing and connecting a 24" RGRCP to an existing SRP irrigation line along the eastern dirt shoulder on the NB side of the street.
134 W Cullumber Avenue: We will be terminating a waterline that exists where W Cullumber and Oak Street intersect. Our TCP will allow for traffic to still pass through with the use of flagmen, and the exit for 134 W Cullumber on the furthest western side of "District Lofts" will still be maintained.
Permit #TRESCOM-2026-00671 · gilbert · issued Jul 6, 2026
$0
Issued
245 N Neely Street: We will be installing and connecting a 24" RGRCP to an existing SRP irrigation line along the eastern dirt shoulder on the NB side of the street. 134 W Cullumber Avenue: We will be terminating a waterline that exists where W Cullumber and Oak Street intersect. Our TCP will allow for traffic to still pass through with the use of flagmen, and the exit for 134 W Cullumber on the furthest western side of "District Lofts" will still be maintained.
0JLB Builders LLC (Likely)