WARMWe are requesting a permit for replacing the B phase bussing and block at the meter socket for Suite 1 at 218 W Hampton Ave. We will schedule an outage and reconnection with SRP for this permit. This will be replaced with a same fitment Millbank Block and corresponding bussing.
Permit #PMT26-10207 · mesa · issued Jun 8, 2026
$4,100
Issued
We are requesting a permit for replacing the B phase bussing and block at the meter socket for Suite 1 at 218 W Hampton Ave. We will schedule an outage and reconnection with SRP for this permit. This will be replaced with a same fitment Millbank Block and corresponding bussing.
0Allied Electric Technology LLC (Verified)