WARMRepairs to fire damaged (4) unit multifamily home COB25-00163. New architectural and MEP. New trusses over units A, B, and C. New drywall, cabinets, plumbing fixtures, doors, windows, insulation, floor coverings, roof sheathing, walls, headers, mechanical RTUs, and rafters at unit A patio. New electrical 400A single phase SES with (4) 100A single phase meters and panels. Existing non-fire sprinklered building, none required. Results in CoC.
The inspection of the site identified the following: Please note that before a damage permit is issued an estimate showing the
Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the
insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal
estimations shall not be used. : This structure shall be restored per plan/engineering in compliance with 2017 NEC, 2018
IRC/IBC requirements. Any deviation will require submitting and addenda to the plans before any
restoration/construction can resume and will result in a Stop Work Order. Structural members were damaged by and will
need stamped engineering. Electrical sustained damage to several home runs, panel may not need to be replaced
unless it can?t accommodate the requirements needed to comply with 2018 IRC/IBC and/or 2017 NEC. All damaged
wires must be replaced per 2017 NEC/2018 IRC. Mechanical equipment was damaged, and all mechanical components
will need replacing. Minor damage to plumbing, some pipes will need to be replaced or repaired.
Note: Any structural members charred to a depth of 1/8” or greater are to be replaced. All plumbing, electrical and mechanical
systems damaged by heat are to be replaced.
A. Building is: Commercial
B. Building permits and inspections are required for the following phase(s) of construction:
1. Structural Yes 2 Electrical Yes 3. Mechanical Yes 4. Plumbing Yes 5. Construction Plans Required Yes
Due to the extent of damage construction drawings are required for repairing the structure. Please upload your construction
documents into the City of Mesa online permit system (DIMES) for review and permitting. Additional information on uploading plans
is at https://www.mesaaz.gov/
Electrical service can be restored under the following conditions: Temp electric can be issued during construction, however the
City of Mesa reserves the right to disconnect power if inspections go beyond 160 days or work is being done without a
permit. No occupancy until a C of C is obtained.
Natural gas service can only be restored after a gas test has been approved by the building inspector.